When is an HRSD Flow Acceptance Letter required?
  • Gravity flow is 2,000 gallons per day (gpd) or greater and pump station is 25 gallons per minute (gpm) or less
  • Gravity flow is greater than 40,000 gpd (129 lots)
  • Pump station is greater than 25 gpm

If a pump station connects directly to existing force main, a Flow Acceptance Letter is required. If gravity flow is less than 2,000 gpd, a Flow Acceptance Letter is not required.