Utility Connection Fee Schedule

Connection fees are required for all new service locations. Water and sewer connection fees are based on water meter size and whether the City or a developer extended the water and / or sewer mains for a new service.

Developer Funded Fee Schedule I

Meter SizeMeter Installation FeeWater Connection FeeSewer Connection FeeHRSD Connection Fee
5/8 inch$150$3,108$2,702

$2,285

3/4 inch$200$4,662$4,053$4,210
1 inch$300$7,770$6,755$7,410
1 1/2 inch$500$15,540$13,510$17,590
2 inchCost plus 15%$25,864$21,616$34,415
3 inchCost plus 15%$49,728$43,232$88,570
4 inchCost plus 15%$77,700$67,550$173,245
6 inchCost plus 15%$155,400$135,100$445,910
8 inchCost plus 15%$248,640$216,160$872,130
10 inchCost plus 15%$357,420$310,730$1,467,435
12 inchCost plus 15%$000,000$000,000$2,244,900

Master Metered Multi-Family (per dwelling unit) Water: $2,486.00 Sewer: $2,162.00 

Master Metered Stand-Alone Single Family (per dwelling unit) Water: $3,108.00 Sewer: $2,702.00

City Funded Fee Schedule II

Meter SizeMeter Installation FeeWater Connection FeeSewer Connection FeeHRSD Connection Fee
5/8 inch$150$3,697$3,519$2,285
3/4 inch$200$5,546$5,279$4,210
1 inch$300$9,243$8,798$7,410
1 1/2 inch$500$18,485$17,595$17,590
2 inchCost plus 15%$29,576$28,152$34,415
3 inchCost plus 15%$59,152$56,304$88,570
4 inchCost plus 15%$92,425$87,975$173,245
6 inchCost plus 15%$184,850$175,950$445,910
8 inchCost plus 15%$295,760$281,520$872,130
10 inchCost plus 15%$425,155$404,685$1,467,435
12 inchCost plus 15% $000,000$000,000 $2,244,900 

Master Metered Multi-Family (per dwelling unit) Water: $2,958 Sewer: $2,815

Master Metered Stand-Alone Single Family (per dwelling unit) Water: $3,697 Sewer: $3,519

City Code, Article IV, Sec 78-86, describes connection fees in detail. Call 757-382-6352 for more information.