Prepared December 17, 2009 for Dominion Generation by MACTEC Engineering and Consulting, Inc.
MACTEC Engineering and Consulting, Inc. (MACTEC) is pleased to present the following Post-Construction Ash Fill, Soil Cover and Groundwater Evaluation Report for the Battlefield Golf Club Ash RE-use Site in Chesapeake, Virginia. Field activities were performed in general accordance with the Sampling and Analysis Plans (SAPs) for the Site, dated November 7, 2008 and May 26, 2009. Services were performed in accordance with the existing Standard Terms and Conditions of the Dominion/MACTEC Master Agreement.
- Full Document (PDF)
- Cover (PDF)
- Cover Letter (PDF)
- Table of Contents (PDF)
- Acronyms and Abbreviations (PDF)
- Executive Summary (PDF)
- Report (PDF)
- Introduction
- Background
- Physical Setting
- Investigation Activities
- Investigation Findings
- Summary and Conclusions
- References (PDF)
- Tables (PDF)
- Figures (PDF)
- Appendix A - Field Sampling Forms (PDF)
- Appendix B - Slug Test Evaluation Data (PDF)
- Appendix C - Physical Laboratory Test Data (PDF)
- Appendix D - Boring Logs and Well Completion Diagrams (PDF)
- Appendix E - Laboratory Data Summary Reports (PDF) - For ease of use, this document has been broken into smaller sections:
- Pages 50,534 to 50,633 (PDF)
- Pages 50,634 to 50,733 (PDF)
- Pages 50,734 to 50,833 (PDF)
- Pages 50,834 to 50,933 (PDF)
- Pages 50,934 to 51,033 (PDF)
- Pages 51,034 to 51,106 (PDF)
- Appendix F - Sampling and Analysis Plans (PDF)
- Appendix G - Waste Disposal Manifests (PDF)