Public Works Department - Stormwater Management
Watershed Reports
Southern Chesapeake

Entire study pdf
(115 pages - 35.3 mb) - print quality
NOTE: All documents are in Adobe
PDF format
and will open in a new browser window.
Table of Contents
- Executive Summary
- Background
- Methodology
- Modeling Configurations
- Modeling Results
- Master Drainage Plan Improvements
- Environmental Restoration and Protection Opportunities
- Contact Information
Figures
Figure 1. Southern Chesapeake 2 & 3 Watershed MDPU Map
Figure 2. Soils with Wetlands Overlay
Figure 3. Existing Conditions Subcatchments with Shaded Imperviousness
Figure 4. Future Conditions Subcatchments with Shaded Imperviousness Figure 5. Potential Increase in Imperviousness
Figure 6. Link-Node Diagram – Existing Conditions
Figure 7. Link-Node Diagram – Future Conditions
Figure 8. Flooding for 10-Yr and 50-Yr Storms: Existing Hydrology, Existing Drainage
Figure 9. Flooding for 10-Yr and 50-Yr Storms: Future Hydrology, Existing Drainage
Figure 10. Future Improvements with Wetlands Underlay
Figure 11. Flooding for 10-Yr and 50-Yr Storms: Future Hydrology, Future Drainage
Figure 12. Bench Design Alternatives
Figure 13. Potential Environmental Restoration and Protection ProjectsTables
Table 1. St. Brides Outfall — 1988 Proposed Drainage Alternatives
Table 2. Homestead Outfall — 1988 Proposed Drainage Alternatives
Table 3. St. Brides Road Bridge (Nodes 910 – 912) 50-Year Water Surface Elevations
Table C-1. Existing Conditions Peak Water Surface Elevations
Table C-2. Future Conditions Peak Water Surface Elevations
Table C-3. Future Conditions Peak Water Surface Elevations
Table D-1. Subarea ImperviousnessAppendices
For more information, please contact:
Sam Sawan
P.E. Senior Stormwater Engineer
Chesapeake Public Works Department
Engineering
Phone: 757-382-6101
FAX: 757-382-8537
Some documents on this page are in
PDF format.
Download free Adobe
Acrobat Reader to view files.
City of Chesapeake, Virginia
