Public Works Department - Stormwater Management
Watershed Reports
New Mill Creek

Entire study pdf
(90 pages - 15.3mb) - print quality
NOTE: All documents are in Adobe
PDF format
and will open in a new browser window.
Table of Contents
- Executive Summary
- Background
- Methodology
- Modeling Configurations
- Modeling Results
- Back-to-Back Storms Analysis
- Master Drainage Plan Improvements
- Environmental Restoration and Protection Opportunities
- Contact Information
Figures
Figure 1. New Mill Creek Watershed MDPU Map
Figure 2. Soils with Wetlands Overlay
Figure 3. Existing Conditions Subcatchments with Shaded Imperviousness
Figure 4. Future Conditions Subcatchments with Shaded Imperviousness
Figure 5. Link-Node Diagram – Existing Conditions
Figure 6. Link-Node Diagram – Future Conditions
Figure 7. Flooding for 10-Yr and 50-Yr Storms: Existing Hydrology, Existing Drainage
Figure 8. Future Improvements
Figure 9. Flooding for 10-Yr and 50-Yr Storms: Future Hydrology, Future Drainage
Figure 10. Alternative Water Quality Design Improvements
Figure 11. Potential Environmental Restoration and Protection ProjectsTables
Table C-1. Existing Conditions Peak Water Surface Elevations
Table C-2. Future Conditions Peak Water Surface Elevations
Table C-3. Environmental Restoration Scenario Peak Water Surface Elevations
Table D-1. Back-to-Back Storms AnalysisAppendices
For more information, please contact:
Sam Sawan
P.E. Senior Stormwater Engineer
Chesapeake Public Works Department
Engineering
Phone: 757-382-6101
FAX: 757-382-8537
Some documents on this page are in
PDF format.
Download free Adobe
Acrobat Reader to view files.
City of Chesapeake, Virginia
