The Public Facilities Manual (PFM) Volume 1 was updated & new policies became effective July 31, 2005.
Summary
of the modifications
Public Works Department
Public Facilities Manual
City of Chesapeake
Public Facilities Manual
(PFM)
The Public Facilities Manual for the City of Chesapeake
is available online
in
PDF format and, in some cases, in
WORD docs.
These manuals detail Chesapeake's design and construction standards, as well as technical specifications for the construction of all public facilities.
- If you have technical questions regarding
the criteria and standards please call
(757) 382-6315 or 382-8298.
- For viewing the
pdf files, Acrobat
Reader is required. - If hard copies are required, contact Hackworth Reprographics at (757) 545-7675
at 1700 Liberty ST, Chesapeake, Virginia.
The following is the July 2005 version
- Go to Volume I - Design Criteria and Policy
- Go to Volume II - City Standards
- Go to Volume III - Technical Specifications
VOLUME I - DESIGN CRITERIA AND POLICY
Table of Contents
CHAPTERS
- Construction Plan Requirements
- Construction Record Drawings
- Post Approval Plan Requirements (Incorporated into Chapter 1)
- Plats
- Drainage Design - Water Quantity
- Stormwater Quality
- Pavement Design
- Street Design
- Commercial Entrance and Site Design
- Utilities Design
- Traffic Control Design
- Street Lighting Design
- Fire Protection Updated 4-01-07 - revisions are in red
- Franchise Utilities
- Soil Drainage Mgmnt Plan
- Access Management
- Environmental Site Assessments
GUIDELINES
- Preliminary Plat Review Checklist
- Street Closure Checklist
- Borrow Pits Checklist
- Erosion and Sediment Control Checklist
- Soil Drainage Management Plan Checklist
- Digging Permit Checklist
- Site Plan Checklist
- Subdivison Checklist
- Utilities Checklist
- Pump Station Checklist
- Pump Station Shop Drawings
- Subdivision Plat Review Checklist
- Miscellaneous Site Worksheet
- Easement & Right-OF-Way Plate Review
- CPBA Single Family Residential Plans
- Fence, Wall, Hedge Or Sign Checklist
- StormwaterCheck list
- Checklist for SITE/SUBDIVISION PLAN Submittal Package
- Fire Department Review Checklist
FLOWCHARTS
Chesapeake Bay Preservation Plan
Development Review Process
Final Site Plan
Final Site Plan Permit Process
Fire Proection or Hazardous Materials Systems Plan Review
Site Plan/Planning App. Review (Fire Dept.)
Soil Drainage Management Plan
Preliminary Site Plan Review
SDMP
SubdivisionAPPENDICES
NOTE: Some appendices are provided in bothPDF &
WORD formats.
- Statement of Responsibility for Subdivision Inspections Fees
- Variance Procedure
- Construction Record Drawings
- Rainfall Intensity Curve
- Subdivision Pavements Design
- Design Superelevation
- Plat Notes & Easements
- State Health Regulations
- (UNUSED)
- Private Drainage Easement Agreement -
WORD
- 2-Party Drainage Easement Agreement -
WORD
- 3-Party Drainage Easement Agreement -
WORD
- SDMP Easement Relocation Agreement -
WORD
- Corrosion Abrasion Design Procedure
- Vertical Curves
- TidalFlooding Frequency Curves (HUD)
- Parking Lot Aisle Widths
- Fire Flow Calculation
- Fire Lane Painting and Signs
- Public Drainage Easement Agreement -
WORD
- Public Impoundment Certificate
- Suggested General Construction Notes
- City or State Road Construction Plans Agreement -
WORD
- Turn Lane Design Requirements
- Engineer Estimate of Required Public Improvements
- Unit Price List
- Single Family Detached Lot Grading Policy
- Basic Lot Grading Scheme
- Stormwater Deed Easement & Maintainance Agreement -
WORD
- License Agreement
- Public Drainage Access Easement Agreement -
WORD
- Right-of-Way Dedication Agreement -
WORD
- Traffic Control Easement -
WORD
- Visibility Easement -
WORD
- N/A
- Public Pedestrian Access Easement Agreement -
WORD
- Deed of Easement & Maintenance Agreement for Churches -
WORD
VOLUME II - CITY STANDARDS
Curbs, Entrances, Gutters and Sidewalks
- CG-2 Standard Curb
- CG-3 Mountable Curb
- CG-3A Mountable 4” Curb & Gutter
- CG-5 (1 of 2) 24” Curb & Gutter
- CG-5 (2 of 2) 24” Curb & Gutter (ENGINEER DATA)
- CG-6 (1 of 2) 30” Curb & Gutter
- CG-6 (2 of 2) 30” Curb & Gutter (ENGINEER DATA)
- CG-7 Residential Entrance for Streets with Curb & Gutter
- CG-7A Residential Entrance for Streets without Curb & Gutter
- CG-7B High Traffic Volume Residential Entrance with Curb & Gutter
- CG-7C High Traffic Volume Residential Entrance without Curb & Gutter
- CG-8 Valley Gutter
- CG-8A High Traffic Volume Valley Gutter
- CG-10 Commercial Entrance for Curbed Streets
- CG-10A High Traffic Volume Commercial Entrance for Curbed Streets
- CG-11 Commercial Entrance for Curb Less Secondary and Undivided Primary Highways
- CG-11A Commercial Entrance for Curb Less Secondary and Undivided Primary Highways (Streets having >= 40 MPH Speed Limit or >= 10,000 V.P.D Traffic Volume)
- CG-12 Commercial Entrance for Divided Arterial Highways without Service Roads
- HR-1A Handicap Ramp Perpendicular Application
- HR-1B Handicap Ramp Parallel Application
- HR-1C Handicap Ramp Combined Parallel and Perpendicular Application
- HR-1D Handicap Ramp Detectable Warning Detail Updated 12-15-04
- SW-1 Sidewalk
STREET SECTIONS AND GEOMETRIC DESIGNS
- R/W-1 Permanent Monument
- R/W-3 Single Left Turn Lane – 12’
- R/W-50 Typical Section for 50’ R/W
- R/W-60 TR/W-60 Typical Section for 60’ R/W
- R/W-70 Typical Section for 70’ R/W
- R/W-80 Typical Section for 80’ R/W
- R/W-90 Typical Section for 90’ R/W
- CA-1 City Alley
- CS-1 (Symmetrical) 50' R/W Residential Cul-de-Sac
- CS-2 (Asymmetrical) 50' R/W Residential Cul-de-Sac
- CS-3 (Symmetrical) 60' R/W Residential Cul-de-Sac
- CS-4 (Asymmetrical) 60' R/W Residential Cul-de-Sac
- CS-5 (Open Throat Cul-de-Sac
DRAINAGE ITEMS
- CB-1 (1 of 3) Catch Basin (12” – 18” Pipe) Maximum Depth 6’
- CB-1 (2 of 3) Catch Basin Concrete (12” – 18” Pipe) Maximum Depth 6’
- CB-1 (3 of 3) Catch Basin Brick (12” – 18” Pipe) Maximum Depth 6’
- CB-2 Catch Basin Concrete (21” – 60” Pipe) Maximum Depth 16’
- CB-2A Catch Basin Brick (21” – 48” Pipe) Maximum Depth 6’
- MCB-1 Multiple Catch Basin Concrete (12” – 18” Pipe) Maximum Depth 6’
- MCB-1A Multiple Catch Basin Brick (12” – 18” Pipe) Maximum Depth 6’
- MCB-2 Multiple Catch Basin Concrete (21” – 60” Pipe) Maximum Depth 16’
- JB-1 (1 of 4) Junction Box Concrete (48” – 72” Pipe) (Detail of Towers)
- JB-1 (2 of 4) Junction Box Concrete (48” – 72” Pipe) (Detail of Chamber)
- JB-1 (3 of 4) Junction Box Concrete (48” – 72” Pipe)
(Location of Chamber to Fit Various Flow Line Angles)- JB-1 (4 of 4) Junction Box Concrete (48” – 72” Pipe)
(Displacement Quantities for Pipe Opening)- SDI-T Precast Top and Cast Iron Grate and Collar Detail
- SDI-1 Shallow Drop Inlet – Concrete (12” – 18” Pipe) Maximum Depth 6’ Updated 12-15-04
- SDI-1A Shallow Drop Inlet – Brick (12” – 18” Pipe) Maximum Depth 6’
- SDI-2 Shallow Drop Inlet – Concrete (21” – 24” Pipe) Maximum Depth 6’
- SDI-2A Shallow Drop Inlet – Brick (21” – 24” Pipe) Maximum Depth 6'
- SDI-3 Drop Inlet – Concrete (27” – 48” Pipe) Maximum Depth 6’ Updated 12-15-04
- MFC-1 Storm Manhole Frame & Cover (24”)
- MH-1 Storm Drain Manhole Concrete (12” – 48” Pipe)
- MH-1A Storm Drain Manhole Brick (12” – 48” Pipe) Maximum Depth 6’
- MH-2 Precast Storm Drain Manhole (12” – 36” Pipe)
- MH-2A Precast Storm Drain Manhole (42” – 72” Pipe)
- IS-1 Shaping of Manhole, Drop Inlet, and Catch Basin Inverts
- ST-1 Step
- HW-1 Headwall for Pipe Culverts
- EW-1 (1 of 3) Endwall for Pipe Culverts (Plan & Elevations)
- EW-1 (2 of 3) Endwall for Pipe Culverts (Data for 42” – 84” Circular Pipe Culverts)
- EW-1 (3 of 3) Endwall for Pipe Culverts (Table of Dimensions & Concrete Volumes per Endwall for Elliptical Pipe Culverts)
- ESC-1 Erosion Control with Stone
- ECSB Erosion Control with Sand Cement Bags
- PD-1 Paved Ditch
- SD-YD Standard Yard Drain
PAVEMENT ITEMS
- PC-1 (1 of 2) Pavement Cut Detail (TYP. ASPHALT PAVEMENT PATCH)
- PC-1 (2 of 2) Pavement Cut Detail (Part 2) (LONGITUDNAL & TRANSVERSE PATCH)
- PC-2 Pavement Cut Detail Enhanced Reliability Regiments
- PC-3 Pavement Tie In Details
- PC-4 Pavement Cut Detail for Utilities Installed in Road Footprint
- M-1 Quarter Milling
- M-2 Full Depth Milling
- M-3 Milling
- MRPO-1 Mailbox Relocation & Pull-Off
- MRPO-2 Mailbox Relocation & Pull-Off (Adjacent to Driveway)
- MRPO-3 Mailbox Relocation & Pull-Off (Adjacent to Driveway)
- ADR Driveway Restoration
- RE Roadway Widening Excavation
- SR-A Shoulder Restoration
- SR-B Shoulder Restoration
- SR-C Shoulder Restoration
MISCELLANEOUS
- B-1 Barricade Detail
- B-2 Road Edge (Delineator Details)
- BP-1,2,3 Barrier Protection for Facilities Using Combustible Fuels
- CHN-A Curb House Number Painting Permit
- CHN-B Curb House Number Painting Permit
- LAE - Lake Access Easement and Access Signs
- UTA-1 Utility Top Adjustment
EARTHWORKS (EW)
- EW-01 Pipe Bedding Details
- EW-02 (1 of 2) Payment Limits Trench Excavation and Backfill
- EW-02 (2 of 2) Payment Limits Trench Excavation and Backfill
- EW-03 (1 of 2) Trench Width Detail for Pavement of Contingent Items
- EW-03 (2 of 2) Trench Width Details for Pavement of Contingent Items
WATER DISTRIBUTION SYSTEMS (WD)
- WD-01 Single & Dual Service Connections
- WD-02 Water Service Installation
- WD-03 (1 of 2) Water Meter Box (Type I)
- WD-03 (2 of 2) Water Meter Box (Type I)
- WD-05 (1 of 2) Blow-Off Assembly
- WD-05 (2 of 2) Blow-Off Assembly
- WD-06 Fire Hydrant Setting (Type I)
- WD-07 Fire Hydrant Setting (Type II)
- WD-08 Fire Hydrant Setting (Type III)
- WD-09 Temporary Manifold for Test and Chlorination
- WD-10 (1 of 2) Precast Concrete Vault-Non-Load Bearing (3” thru 10” Water Meter Assemblies)
- WD-10 (2 of 2) Precast Concrete Vault-Non-Load Bearing (3” thru 10” Water Meter Assemblies)
- VP-1 Typical Valve Placement
- WMV-1 1½ “ & 2” Meter Vault for 2” Tap on Water Mains, 8” & Above
- WMV-2 Meter Vault Detail / Specs Meter size 3” to 8”
- FH-4 Typical Hydrant Placement
SANITARY SYSTEMS (SS)
- SS-01 (1 of 2) Standard Precast Concrete Manhole with Extended Monolithic Base
- SS-01 (2 of 2) Standard Precast Concrete Manhole with Extended Monolithic Base
- SS-02 Precast Concrete Shallow Manhole
- SS-03 (1 of 2) Sanitary Sewer Straddle Manhole
- SS-03 (2 of 2) Sanitary Sewer Straddle Manhole
- SS-04 Sanitary Sewer Interior Drop Manhole
- SS-05 Sanitary Sewer Exterior Drop Manhole (for Existing Manhole Only)
- SS-06 Sanitary Sewer Manhole Adjustment
- SS-07 Sanitary Sewer Manhole Invert Shaping
- SS-08 Connection into Existing Manholes
- SS-09 Sanitary Sewer Manhole Casting (24”)
- SS-10 Sanitary Sewer Manhole Casting (24”)
- SS-13 (1of 2) Sanitary Sewer Main Line Clean Out Box
- SS-13 (2 of 2) Sanitary Sewer Main Line Clean Out Box
- SS-14 Sanitary Sewer Service Connection
- SS-15 Dual Sanitary Sewer Service Connection
- SS-16 Deep Sanitary Sewer Service Connection
- SS-17 Dual Sanitary Sewer Service Connection
- SS-18 Force Main Connection to H.R.S.D. Force Main
- EMT-1 Force Main Tie-In
- EPC-1 Emergency Pump Connection
WATER & SANITARY SYSTEMS (WS)
- WS-01 (1 of 2) Standard Valve Box Frame and Cover
- WS-01 (2 of 2) Standard Valve Box Frame and Cover
- WS-02 Valve Setting Detail
- WS-03 Manual Air Vent Assembly
- WS-04 (1 of 2) Steel Casing Detail
- WS-04 (2 of 2) Steel Casing Detail
- WS-05 (1 of 2)Standard Thrust Blocks
- WS-05 (2 of 2)Standard Thrust Blocks
- WS-06 Obstruction By-Pass Uniform Offset
- WS-07 Restraining Rod Detail
- TE-1 Transition Easement
VOLUME III - TECHNICAL
SPECIFICATIONS
Entire Volume III - 2,611K
- FOREWORD
- TABLE OF CONTENTS
- DEFINITIONS
- REQUIREMENTS FOR DEVELOPMENT
- TECHNICAL SPECIFICATIONS
- ROADWAY CONSTRUCTION
- DIVISION 1. Regular Excavation
- DIVISION 2. Undercut Excavation
- DIVISION 3. Allaying Dust
- DIVISION 4. Select Borrow I, CBR 20
- DIVISION 5. Select Borrow II, CBR 15
- DIVISION 6. Aggregate Base and Subbase Course
- DIVISION 7. Asphalt Concrete Base Course
- DIVISION 8. Liquid Asphalt Coat
- DIVISION 9. Asphalt Concrete Surface Course
- DRAINAGE CONSTRUCTION
- DIVISION 10. Storm Drain Pipe & Flared End Sections
- DIVISION 11. Catch Basins, Manholes, Conflict Manholes & Drop Inlets
- DIVISION 12. Box Culvert Concrete, Headwalls, & Endwalls
- DIVISION 13. Reinforcing Steel (Box Culvert)
- DIVISION 14. Bedding Material (Box Culvert)
- DIVISION 15. Minor Structure Excavation (Box Culvert)
- DIVISION 16. Bedding Material (Drainage and Utility pipe)
- DIVISION 17. Sand Cement Bag Rip-Rap & Ditch Regrading
- INCIDENTAL CONSTRUCTION
- DIVISION 18. Mobilization
- DIVISION 19. Clearing & Grubbing
- DIVISION 20. Topsoil & Seeding and Restoration
- DIVISION 21. Pavement Patching
- DIVISION 22. Curb & Gutter and Other Incidental Concrete
- DIVISION 23. Erosion and Sediment Control
- DIVISION 24. Demolition
- DIVISION 25. Chain Link Fence
- DIVISION 26. Mowing
- DIVISION 27. Sign Islands
- DIVISION 28. Barricade
- DIVISION 29. Guardrail
- DIVISION 30. Soil Reinforcement and Filter Material
- DIVISION 31. Asphalt Overlay Fabric
- DIVISION 32. Project Identification Signboard
- WATER & SEWER
- DIVISION 33. Water Mains
- DIVISION 34. Force Mains & Gravity Sewers
- DIVISION 35. Sanitary Sewer Manholes & Cleanouts
- PUMPING STATIONS
- DIVISION 36. Concrete For Water & Sewer
- DIVISION 37. Masonry
- DIVISION 38. Doors, Frames & Miscellaneous Metal
- DIVISION 39. Roofing and Woodwork
- DIVISION 40. Pump Station Sitework & Landscaping
- DIVISION 41. Painting
- DIVISION 42. Piping, Valves and Fittings
- DIVISION 43. Electrical and Controls
- DIVISION 44. Mechanical Equipment
- BRIDGE AND STRUCTURES
- DIVISION 45. Bridge
- BRIDGE FENDER REPAIRS
- DIVISION 46. Treated Timber Pile
- DIVISION 47. Treated Timber Wales
- DIVISION 48. Platforms, Walkway, Handrail & Posts
- ASPHALT CONCRETE RESURFACING
- DIVISION 49. Asphalt Concrete Resurfacing Courses
- DIVISION 50. Milling/Profiling Existing Asphaltic Surface and Roadway Preparation
- DIVISION 51. Surface Recycling of Asphalt Pavement
- DIVISION 52. Pavement Sealing
SLIP-LINING OF EXISTING SEWER LINE
- DIVISION 53. Slip-Lining of Existing Sewer Line
- INSITUFORM LINING
- DIVISION 54. Insituform Lining
- BY-PASS PUMPING
- DIVISION 55. By-Pass Pumping
BORED PIPE
- DIVISION 56. Bored Pipe
- WORK ON RAILROAD PROPERTY
- DIVISION 57. Work on Railroad Property
- TRAFFIC CONTROL
- DIVISION 58. Traffic Signal Updated 01-05
- DIVISION 59. Fully Actuated Traffic Controller Updated 01-05
- DIVISION 60. Video Vehicle Detection System
- DIVISION 61. Traffic Control Signal Heads Updated 01-05
- DIVISION 62. Traffic Signs
- DIVISION 63. Street Name Signs
- DIVISION 64. Internally Illuminated Street Name Signs Updated 08-05
- DIVISION 65. Maintenance Of Traffic
- DIVISION 66. Pavement Markings And Markers
- DIVISION 67. Detour
- DIVISION 68. Right-of-way Restoration And Temporary Construction Requirements
- DIVISION 69. Traffic Signal Interconnect Cable
- DIVISION 70. Detectors
- DIVISION 71. Uninterruptible Power System for Traffic Signal
- DIVISION 72. Spread Spectrum Wireless Interconnect Specs
- DIVISION 73. Specification for Pedestrian Countdown Signal
Some documents on this page are in
PDF format.
Download free Adobe
Acrobat Reader to view files.
City of Chesapeake, Virginia
