Conditional User Permit for a Solid Waste Management Facility
What is a Conditional Use Permit for a Solid Waste Management Facility?
A conditional use permit for a solid waste management facility is required when the facility operates for the collection, source separation, storage, transportation, transfer, processing, recycling, composting, treatment, or disposal of solid waste. A conditional use permit for a solid waste management facility is required for all zoning districts. The conditional use permit process allows intensive review of the proposed operation to determine whether it is appropriate in specified situations and whether special conditions would make the use sufficiently compatible with the immediate area to warrant the granting of a use permit for the proposed solid waste management facility operations.
Application Deadline
Monday prior to the 2nd Wednesday of the month by 5 p.m.
Planning Commission Public Hearings are held on the 2nd Wednesday of the month. See Planning Commission Public Hearing Schedule
Applicant Responsibilities
- A complete Conditional Use Permit for Solid Waste Facility application form.
-
The original and two (3) copies of the complete CUP application, for Solid Waste Facility application, with original signatures on one copy, including all required development information
- Legal Description and common street address of the property (page 3)
- Payment of Filing Fee
- Special Power of Attorney, if applicable
(Included in Conditional Use Permit application) - Statement of Ownership
(Included in Conditional Use Permit application) - Indemnification Agreement for Solid Waste Management Facilities
(Included in Conditional Use Permit application) - Adjacent Property Owners List of names and addresses (Included in Conditional Use Permit application)
Stamped #10 (4 1/8” by 9 1/2”) enveloped with the name and mailing address of each adjacent property owner printed legibly - Post a sign (supplied by the Planning Department) two Wednesdays prior to the Planning Commission Public Hearing),
-
Sign fee is $25 for first sign and $20 for each additional sign.
- Advertising Fees will be billed separately. The average advertising cost is $ 100 for the Planning Commission Public Hearing and the average is between $ 400 to $ 1,000 for the City Council meeting. The project will require a minimum of four ( 4 ) advertisements. Any additional advertising costs incurred due to continuances or revised proffer statements will also be the responsibility of the applicant. Planning Commission advertisement fees will be billed by the City of Chesapeake. City Council advertisement fees will be billed by the Virginia Pilot.
- Site Plans and Maps
-
Zoning Map - reduced to 8½” x 11” paper.
Map of the property - reduced to 8½” x 11” paper.
Vicinity Map - reduced to 8½” x 11” paper. - Preliminary Site Plan of the proposed development, drawn to scale
Submit 30 copies, plus 3 copies reduced to 11” by 17” paper, plus 3 copies reduced to 8 ½” by 11” paper - Landscape Plan
Four (4) copies reduced to 11” by 17” paper and three (3) copies of this plan reduced to 8 ½” by 11” paper, this information may be shown on the preliminary site plan - Drainage and Impact Assessment
(Included in Conditional Use Permit application) - Topographic Map
(Included in Conditional Use Permit application) Two (2) copies of the area within ¾ mile radius of the perimeter site - Detailed Soil and Geology Data
(Included in Conditional Use Permit application) - Hydrology Study
(Included in Conditional Use Permit application) - Closure and Restoration Plan
(Included in Conditional Use Permit application)
Required Forms & Instructions
CUP for Solid Waste Facility Application (16 page, fill-in/print
PDF)
CUP for Solid Waste Facility Application Instructions (9 page,
PDF)